• Sourcing Solutions
  • Services & Membership
  • Help & Community

Quick Details

  • Type: Other Waterproofing Materials
  • Place of Origin: Guangdong, China (Mainland)
  • Brand Name: JBY
  • Model Number: JBY080 JBY100 JBY150
  • package: 50pcs/bag,10 bags/carton
  • Diameter: 13mm
  • Length: 80mm/100mm/150mm/200mm

Packaging & Delivery

Packaging Details 50 pieces a platic bag,10 bags a carton.500pieces a carton
Delivery Time Shipped in 3days after payment

 Metal Injection Packers,Mechanical Packers

Metal Injection packers for high pressure grouting when the needles are locked,they are no skidding and difficult to be broken.Also they have good sealing perfusion without leakage pulp,not to return.Be able to inject the medicament deeply into the wall.

 

The size of injection packers:

1,13mm*80mm      50pcs a transparent bag ,10 bags a carton,500pcs a carton. 

carton size:32*28*10cm  

2,13mm*100mm       50pcs a transparent bag ,10 bags a carton,500pcs a carton.

carton size:32*28*12cm  

3,13mm*150mm       50pcs a transparent bag ,10 bags a carton,500pcs a carton.

carton size:32*28*15cm  

  

 

 

Method of Construction for Injection

 

1. Crack and leakage condition inspection

Check the process procedure after finding the thickness, width and depth of crack and leakage condition of the structure

 

2. Drilling Operation

Drill directly into crack section if the thickness of concrete is thinner than 10cm. For the thickness of 10cm~50cm, drill it with 45 degree angle by keeping a distance of 1/5 of concrete thickness. Make sure it penetrates the crack section. If the thickness is over than 50cm, keep the distance of 20cm~30cm and drill it with 45 degree angle until it penetrates crack section. And keep drilling by maintaining the fixed interval. (5 holes per 1 meter. Drill it in zigzags)

 

3. Packer Installation

Clean the inside of drilled holes with compressor. Make sure that rubber sleeve of packer and cutting line of tightening nut should be put into the inside of concrete surface when installing. Tighten the packer completely by using the T-box. (Packer might be damaged if you tighten it too strongly)

 

4. Injection Operation

Inject the waterstopping material by using the high pressure device or grease gun.  Maintain the initial injection pressure as around 40kg/cm and increase the pressure by each 10kg/cm gradually until the waterstopping material flows out from crack section. Water will come out from the crack section first and then water-stopping foaming agent and then water stopping liquid at last. If the water-stopping material that is not foamed comes from the crack section, then move to next packer for injection.

 

5. Packer Removing Operation

Remove and break the packer by using vise pliers or hammer as a tool. If there is still a wet section, then inject the water stopping material again.

 

6. Finishing Operation

Remove the water stopping material that is remained on the crack section. Spreading with the elastic sealing material.

 

 

Contact:Michelle Tung 

Whatsapp.:+86 18680531939 

Skype:michelle63687

 

Transaction History of the Supplier

Below is the information about the supplier's transactions conducted via Alibaba.com. If you require further details regarding the transaction data, please contact the supplier directly.

Transaction Overview

Transactions

Transaction Details

This supplier has completedtransactions with buyers from .

Shipping Destination
Transaction Value
Transaction Date
Email to this supplier
China (Mainland)
Transaction Level:
Supplier Assessments:
The supplier supports Trade Assurance – A free service that protects your orders from payment to delivery.
Supplier's Trade Assurance Limit: US $32,000
Learn More