• Sourcing Solutions
  • Services & Membership
  • Help & Community

Quick Details

  • Place of Origin: Guangdong, China (Mainland)
  • Brand Name: JBY
  • Model Number: JBY760
  • After-sales Service Provided: No overseas service provided
  • Weight: 70kg
  • Color: red

Packaging & Delivery

Packaging Details carton
Delivery Time 7 days

JBY760Mortar Spraying Grouting Pump

JBY-760 cement grouting spraying machine with rich experience in the field of cement-based grouting, adopting R-WRT Screw pump core, have increased the stable performance of single-phase electric power unit. Its superior mechanical performance, reliability, better value, higher construction efficiency, greatly improves the efficiency of grouting.

 

 

 

 

 

Technical Data

 

Power

220V/1100W

Flow  (L / min)

0-8L/min

The Maximum Output Voltage

0-1.5Mpa(0-15kg/cm2)

The Level Capacity of Transmission

60M

The Vertical Capacity of Transmission

35M

The Maximum Aggregate Particles

0-2mm

Capacity ( L)

20L

Volume Size

105cm*53cm*109cm

Weight

70kg

 

Application Places

 

1.Concrete buildings, railway tunnels, highway Bridges, culverts, urban subway, hydropower station, the dam slope harbor engineering such as crack, construction joint, expansion joint grouting waterproof and anchor grouting, the grouting solidarity, backfill grouting and curtain grouting, soft rock reinforcement, honeycomb structure, soil cement grouting or composite grouting engineering, etc.

 

2. Building wall waterproof coating, cement mortar spraying, dry powder mortar spraying, powder spraying, coating putty, really stone paint spraying, rockery, sculpture handicraft coating engineering etc.

 

 

Necessary Construction Conditions

 

1. Water and electricity should be provided on site.

 

2. The construction place should be safe and smoothed, then covered with a safety net.

 

3. Machine and materials should avoid exposing in damp place.

 

4. Tightly connect the deliver hose, air hose, water hose and power line.

 

 

Matters Needing Attention

 

1. The construction place must wear protective equipment (such as gloves, masks, goggle, and helmet).

 

2. Before construction, please pour a moderate amount of washing powder or detergent into the hopper, then switched on 1-3 minutes, make the pipe better wetting unobstructed with good mobility. Pure water is not allowed, in order to protect the core will not rust and can start smoothly next time.

 

3. While the machine is working, the electric box must be closed and locked, to prevent dust and moisture make the damage of machine components.

 

4. Every day before work or after work bearing, it must always check the oil and gearbox oil.

 

5. Moving the machine in the construction place, regardless of what distance, must pull out the power line first.

 

6. After construction should be clean the machine and pipe in time, the electric box can only be wiped, do not wash.

 

7. When used as a sprayer, subject to equipped with 0.25-0.36 cm3 / min of air compressor and the special sprayer gun.

 

Contact person: Grace Huang

 

 

Mob:86-18666095330

 

Whatsapp:18666095330

 

Skype: gracehuang152

 

Transaction History of the Supplier

Below is the information about the supplier's transactions conducted via Alibaba.com. If you require further details regarding the transaction data, please contact the supplier directly.

Transaction Overview

Transactions

Transaction Details

This supplier has completedtransactions with buyers from .

Shipping Destination
Transaction Value
Transaction Date
Email to this supplier
China (Mainland)
Transaction Level:
Supplier Assessments:
The supplier supports Trade Assurance – A free service that protects your orders from payment to delivery.
Supplier's Trade Assurance Limit: US $31,000
Learn More